    Most Perth homeowners delay window replacement longer than they
    should. The reason is rarely cost. It is the unknown of the process: the
    disruption, the timeline, the noise, the holes in the wall, the question
    of where to put the cat for two days. The fear of the install is bigger
    than the fear of the cost.

    This article walks the process end to end, from the first phone call
    to the moment the install team drives away. Drawn from the Penot Double
    Glazing five-stage process and the AGWA Guide to Residential
    Installation (July 2020), it covers what happens, when it happens, and
    what to plan around. Most of the things people worry about turn out to
    be smaller than the worry.

    Why So
    Many Perth Homeowners Delay Window Replacement

    Three concerns dominate the delay.

    Disruption. People imagine the house torn apart.
    They imagine plaster dust through the lounge, exposed openings
    overnight, weeks of plastic sheeting over kitchen surfaces. The reality
    is each room is opened and resealed within the same day in most cases,
    and the home stays secure overnight if the install does need to spill
    over.

    Lead time confusion. The “how long will this take”
    question gets vague answers. The reality is more structured than vague:
    a consultation, a manufacture window confirmed by your supplier, then an
    on-site installation phase. Knowing the actual structure reduces the
    open-endedness.

    Quote opacity. Two suppliers can quote the same
    windows and arrive at very different numbers because they are specifying
    different products. The fear is choosing the wrong supplier and
    inheriting the problem for the next 15 years.

    The honest answer to all three concerns is the same: pick a supplier
    that gives specific information at quote stage, run the consultation
    early, and let the actual timeline replace the imagined one. Our choosing a double
    glazing company Perth guide
    covers what separates a good supplier
    from an average one.

    Stage One: The In-Home
    Assessment Visit

    The first consultation typically happens at the home. The assessor
    measures the existing openings, looks at the surrounding finishes, and
    discusses orientation, sun exposure and access. The visit typically runs
    60 to 90 minutes depending on the project size.

    What gets measured:

    • Opening dimensions: width, height, sill height from
      finished floor, head height to ceiling
    • Surrounding finishes: internal architrave, external
      cladding, render condition, sill material, threshold detail at
      doors
    • Frame condition: for window replacement installs,
      whether the existing frame can stay or needs full replacement
    • Orientation: for each opening, the compass
      direction and shading from eaves, neighbouring buildings, or trees
    • Access: ground floor vs upper floor, parking for
      the install truck, sequence of room access

    What gets discussed:

    • The rooms where the upgrade matters most (typically west-facing
      living rooms, bedrooms with noise exposure, and rooms with persistent
      condensation)
    • Glass spec by orientation (low-e for west and unshaded north,
      standard double for south-facing)
    • Frame system (standard or thermally broken aluminium)
    • Hardware preferences
    • Timeline constraints

    For homeowners doing a wider double
    glazing Perth
    refurbishment, the consultation is also where the
    order of priority gets sorted. Sometimes the right answer is two stages:
    the worst rooms now, the rest later. The Penot Double Glazing free in-home assessment is
    the standard route into this conversation.

    Stage Two: Product
    Selection and Quote

    The quote follows the consultation by a few days to a week, depending
    on the size of the project and the complexity of the spec choices.

    The choices to make at this stage:

    • Frame system: standard aluminium or thermally
      broken. For Perth’s climate, thermally broken is usually the right
      answer when the upgrade is a serious thermal upgrade.
    • Glass spec by orientation: typically a
      per-orientation decision. West windows get solar-control low-e double
      glazed at the low end of the SHGC range. South windows get standard
      double glazed.
    • Frame finish: standard Dulux powder-coat range or
      custom, woodgrain foil, dual-colour (different inside/outside).
    • Hardware: standard locks or multi-point, soft-close
      on sliding doors, pull-handle style on entry doors.
    • Configuration: for doors, whether to specify
      French, bifold, lift-and-slide or sliding (our lift and slide vs bifold
      guide
      covers this).

    The quote should specify each of these per opening, plus the AS 2047 water and wind ratings,
    the WERS-listed Uw and SHGC values, the warranty terms (10 years on the
    frame is the Penot standard; ask about IGU seal, hardware and
    installation warranty terms at quote stage), and the total price
    including install.

    For projects that need finance, the conversation happens at this
    stage. Our guide to
    financing double glazing in Perth
    covers the humm90 options. The Penot Double Glazing windows
    range
    covers the spec choices in detail.

    What Affects the
    Lead Time and Why It Varies

    Lead time varies by project and is confirmed at the quote stage. Four
    variables drive the outcome.

    Custom sizes. Off-the-shelf standard sizes
    manufacture faster than custom dimensions. A non-standard reveal size
    adds time relative to a standard opening.

    Custom finish. Standard Dulux powder-coat colours
    have stock availability. Custom colours and woodgrain foils require a
    paint or foil batch run, which adds time.

    Glass spec. Standard double glazed clear units run
    fastest. Acoustic laminated units, solar-control low-e, and triple
    glazed take longer because the glass is sourced separately and the IGU
    is built to order.

    Supplier capacity. Spring and early summer are
    typically the busiest periods for whole-house projects in Perth. Booking
    the consultation early gives the most flexibility on the manufacture
    slot.

    The supplier confirms the specific lead time at quote stage so it is
    in writing rather than estimated.

    Stage
    Three: Preparing the Home for Installation Day

    Two weeks before install, the supplier confirms the date and provides
    a preparation checklist. The standard preparation:

    • Clear the work zone around each opening to 1.5
      metres. Furniture moved or covered. Curtains and blinds removed.
    • Move valuables away from windows. Decorative items,
      electronics, anything fragile.
    • Plan for pets. Cats and dogs need a secure space
      away from open doorways during the install. Birds and fish stay
      covered.
    • Plan for kids. Schools or grandparents during
      install hours. Older kids can be in the home but not in the rooms being
      worked on.
    • Park elsewhere. The install truck needs the
      driveway or a clear kerbside spot near the home.
    • Power and water access. Installers need 240V access
      and water access for cleanup.

    For multi-day installs, the home stays secure overnight via temporary
    closure of any opening that has not been resealed. This is agreed at the
    start of the install rather than improvised.

    What Happens on
    Installation Day, Room by Room

    A typical install day for a whole-house project runs from
    approximately 7:30 AM to 4:30 PM with two to three installers on
    site.

    Morning (7:30 to 10:30 AM): Existing windows removed
    from the rooms scheduled for the day. Openings cleaned and prepared. New
    frames brought in from the truck.

    Late morning (10:30 to 12:30 PM): Frames installed
    plumb and level. Head and sill flashings dressed. Frames sealed to the
    surrounding wall structure.

    Early afternoon (12:30 to 2:30 PM): Glass IGUs
    installed in the frames. Hardware fitted. Locks and seals checked.

    Late afternoon (2:30 to 4:30 PM): Internal
    architrave reset or replaced. External cladding patched if required.
    Trims painted. Debris cleared.

    For a 10-window project, two to three days is typical. For 15-plus
    windows, four to five days. The team works room by room rather than
    opening every window simultaneously, so the home remains liveable during
    the install.

    Post-Installation
    Cleanup and What the Team Leaves Behind

    Standard post-install:

    • All packaging removed from site
    • Window and frame surfaces cleaned of install residue
    • Sticker labels removed from glass
    • Site swept and vacuumed in work zones
    • External patches inspected and touched up
    • Internal architrave repainted if matching existing finish

    Final walkthrough with the homeowner: operating instructions for each
    window and door, key handover, warranty documentation, and an AS 2047
    compliance summary. Any snags are noted and scheduled for follow-up.

    The Penot Double Glazing
    process page
    covers the five-stage flow in the company’s own
    words.

    What the
    Warranty Covers and How to Make a Claim

    The following are industry-standard positions for AGWA member suppliers. Penot Double
    Glazing carries a 10-year warranty on frames; ask about IGU seal,
    hardware and installation warranty terms at the quote stage.

    • IGU seal: 10 years against seal failure (fogging or
      condensation between panes)
    • Frame: 10 years on the powder-coat finish,
      structural frame typically lifetime
    • Hardware: 5 to 10 years depending on the product;
      hardware manufacturers supply their own warranty terms
    • Installation: workmanship is covered for a warranty
      period; confirm specifics at quote stage

    To make a claim: photograph the issue, contact the supplier directly
    (not the manufacturer), and the supplier coordinates the repair or
    replacement. AGWA members commit to a code of conduct that includes
    warranty service.

    How
    to Plan Window Replacement Around a Busy Household Schedule

    Three planning tips:

    • Book the consultation early. Lead time on quotes is
      a few days to a week. Once the quote is firm, the manufacture clock
      starts only after order confirmation. Booking the consultation well
      ahead of the desired install date is comfortable.
    • Coordinate with other trades. If the project
      involves painting, plastering or flooring, sequence the trades so the
      windows install before painting and after plastering.
    • Pick the right week. School holidays are a good
      window for whole-house projects because the household routine flexes.
      The week before a family event is not.

    Where Penot Double Glazing
    Fits

    Penot Double Glazing is a full AGWA member based at 92 Beechboro Rd
    S, Bayswater WA 6053. The five-stage process from consultation to
    handover is documented at the our process page. Every
    install is run by the Penot Double Glazing team rather than
    subcontractors, which keeps the certification and warranty position
    clean.

    For a quote that maps the upgrade against your actual rooms and
    timeline, book a free in-home
    assessment
    . Compare options across the double glazing Perth range, call 1300
    121 603, or visit the Bayswater showroom at 92 Beechboro Rd S.

    How
    Long Does Double Glazing Installation Take in a Perth Home?

    Project run depends on project size, product spec and supplier
    capacity. The supplier confirms the timeline at the quote stage. Most
    whole-house projects involve a consultation and quote, a manufacture
    window, and a multi-day on-site installation phase.

    Do You Have
    to Move Out During Window Replacement?

    No. The home stays occupied during install. Each room is opened and
    resealed within the same day in most cases, with the home secure
    overnight. Furniture near windows is moved or covered. Pets, kids and
    valuables need a plan but the household functions through the
    project.

    What
    Does Penot Double Glazing’s Installation Process Look Like?

    Five stages: in-home consultation and measure, specification and
    quote, manufacture, site installation, and handover with warranty
    documentation. The full process page covers it in
    detail. Every project is run by Penot Double Glazing’s own install team
    rather than subcontractors.